Anyway....
Saturday I didn't do too much. Installed flooring under the stove, some cleanup on the walls (spackling, etc.) and that was it.
Sunday I started replacing the drywall where the backsplash is being replaced. Plus I repaired a few other holes and did more spackling.
View attachment 59768
My wife left to see her parents this morning, and after I dropped her at the airport I primed some of the walls to cover up the old dingy paint and the ceiling where cabinets were removed. Again, trying to be quiet because my son was sleeping.
View attachment 59769
Once he left for work I started to make some noise.
I dove into the pit of hell: The plumbing under the sink. Because the original galvanized supply lines that came through the wall were replaced by copper lines coming up out of the floor but the outside faucet branches off the new pipes and go out through the wall, the only way to get the sink cabinet out was to cut away the area around the pipes.
You can see the setup when I started:
View attachment 59770
So I had to cut the cabinet away around the pipes.
View attachment 59771
View attachment 59772
You may notice the hot water feeds are still connected. That's because the hot water shut off valves don't.... quite.... shut off. Connecting both ends of the dishwasher supply line was the only way I could think of to prevent the constant drip drip drip.
It was Frustration all morning but I finally had Triumph for lunch.